Rotational Molding calculator

Accepted Batch Output Calculator

Count the accepted output available from one completed molding batch. Enter gross parts, separate final scrap and unresolved holds, then the required accepted quantity.

What this calculator does

  • Reconcile gross molded parts, final scrap and unresolved holds into accepted batch output.

Formula used

  • Accepted output = gross molded parts − final scrap − unresolved holds
  • Unreleased parts = final scrap + unresolved holds
  • Quantity margin = accepted output − accepted requirement

Inputs explained

  • Gross Parts Molded: All physically completed parts in the selected batch.
  • Parts Finally Scrapped: Batch parts with final scrap disposition, excluding held parts.
  • Parts Awaiting Final Disposition: Unreleased batch parts in rework or inspection hold.
  • Accepted Batch Requirement: Whole accepted parts required from this batch.

How to use the result

  • Best suited to batch closeout review, inspection hold reconciliation.
  • Does not predict future rework recovery or output from uncompleted cycles.

Current U.S. benchmarks

  • The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The U.S. has 9,635 plastics product manufacturing establishments employing about 677,302 workers (Census County Business Patterns, 2023).

Common questions

  • Can parts awaiting inspection count as accepted? No. Include them in held parts until the required release decision is complete.
  • What if a held part is later scrapped? Move it from hold to final scrap. Do not add it to scrap while leaving it in the held count.
  • Does this forecast a future batch? No. It reconciles observed dispositions for completed parts. Use capacity tools for a future production plan.
  • Why is there no yield multiplier? Accepted output is determined directly from actual counts. An extra percentage would apply the same losses twice.

Last reviewed 2026-10-13.