Rotational Molding calculator
Labor Cost per Mold Cycle Calculator
Find direct labor used each time an individual mold completes a cycle. Enter summed crew hours, the weighted loaded rate and completed mold cycles.
What this calculator does
- Allocate recorded crew labor cost and person-minutes across completed mold cycles.
Formula used
- Recorded labor cost = total person-hours × weighted loaded hourly rate
- Cost per mold cycle = recorded labor cost ÷ individual mold cycles
- Person-minutes per mold cycle = total person-hours × 60 ÷ mold cycles
Inputs explained
- Direct Crew Labor Recorded: Sum of direct labor hours across operators for this population.
- Average Loaded Labor Rate: Weighted hourly labor cost for the recorded operators.
- Completed Individual Mold Cycles: Completed cycles counted separately for each mold handled.
How to use the result
- Best suited to mold handling labor review, crew allocation comparison.
- Mixed molds yield a population average rather than a part-specific labor standard.
Current U.S. benchmarks
- The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 9,635 plastics product manufacturing establishments employing about 677,302 workers (Census County Business Patterns, 2023).
Common questions
- What if three people work for two hours? Enter six person-hours when all their time belongs to the measured work scope.
- Is one carousel index one mold cycle? Not when an arm carries multiple molds. Count the completed cycle of each individual mold in the population.
- How do I handle different pay rates? Use total loaded labor cost divided by total person-hours as the weighted hourly rate.
- Does this include waiting time? Include only waiting assigned to the stated direct-labor scope, and use that same rule across comparisons.
Last reviewed 2026-10-13.