S&OP, Demand Planning & Forecasting calculator
Demand Variability Calculator
Find how far demand swings around its average. You need the average, peak and trough period demand and the variability your plan can absorb.
What this calculator does
- Demand variability as the peak-to-trough swing over the average period demand, compared with the swing the plan absorbs.
Formula used
- Peak-to-trough swing (units/period) = peak period demand − trough period demand
- Demand variability (%) = peak-to-trough swing ÷ average period demand × 100
- Peak above average (%) = (peak period demand − average period demand) ÷ average period demand × 100
- Variability above limit (points) = demand variability − variability limit
Inputs explained
- Average Period Demand: Mean demand per period over the horizon.
- Peak Period Demand: Highest period demand in the horizon.
- Trough Period Demand: Lowest period demand in the horizon.
- Variability Limit: Swing, as a share of the average, your plan absorbs.
How to use the result
- Best suited to sizing safety stock for a product family, deciding whether to flex capacity.
- A range ignores how often demand sits near the extremes. Does not separate seasonality from noise.
Current U.S. benchmarks
- The producer price index for steel mill products stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 3,569 primary metal manufacturing establishments employing about 354,911 workers (Census County Business Patterns, 2023).
Common questions
- Why a range rather than a standard deviation? A range needs three figures a planner has in front of them. A coefficient of variation is better with a full history; use it when you have one.
- What limit should I set? The swing your safety stock and capacity flex are designed for. The 60% default is an example only.
- Why did V1 ask for a variation per period? V1 multiplied a typed-in variation by the period count, so the result restated the input. V2 derives the swing from the demand figures.
- Why does the calculator stop when the average is outside the peak and trough? An average must sit between the lowest and highest period. Figures that do not come from the same series.