Switchgear, Panelboards & Electrical Distribution calculator
Option Complexity Cost Calculator
Find what engineered options add to an order's engineering cost. You need the options added, the engineering cost per option, the share realized in the build and the complexity overhead.
What this calculator does
- Engineering cost that options add to a switchgear order, from the options added, the cost each, the share realized and a fixed overhead.
Formula used
- Engineering on realized options ($) = engineered options added × engineering cost per option × options realized ÷ 100
- Option engineering cost ($) = engineering on realized options + fixed complexity engineering overhead
- Engineering cost per option added = option engineering cost ÷ engineered options added
Inputs explained
- Engineered Options Added: Options beyond the standard design on the order.
- Engineering Cost per Option: Design, drawing and checking cost for one option.
- Options Realized in the Build: Share of quoted options that make it into the build.
- Fixed Complexity Engineering Overhead: Coordination and review overhead for a non-standard order.
How to use the result
- Best suited to pricing a customized switchboard, deciding which options to standardize.
- Does not include the options' material or labor. Ignores interactions between options.
Current U.S. benchmarks
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
- On-highway diesel averages $5.94 per gallon this week (EIA), trending down over recent periods. Truck tonnage is down 1.6% year over year (ATA via BTS and FRED).
- The U.S. has 21,668 machinery manufacturing establishments employing about 1,086,146 workers (Census County Business Patterns, 2023).
Common questions
- What counts as an option? Anything beyond the standard design that needs engineering: metering, custom breaker arrangements, communications or special finishes.
- What is the share realized? The share of quoted options that stay in the order through release. Options dropped at order entry are not engineered.
- Why a fixed overhead? A non-standard order needs coordination, review and approval drawings whatever its option count.
- Does the result include the option hardware? No. Components and labor for each option are priced in the build cost.
Last reviewed 2026-10-28.