Wire Drawing & Rod Processing calculator
Draw Speed Output Calculator
Separate delivered wire speed from the speed achieved while drawing. Supply a length-counter total and elapsed and stopped minutes from the same observation window.
What this calculator does
- Separate delivered wire speed from the speed achieved while drawing.
Formula used
- Drawing time = Elapsed minutes − Stopped minutes
- Average speed = Drawn feet ÷ Elapsed minutes
- Running speed = Drawn feet ÷ Drawing minutes
- Uptime % = 100 × Drawing minutes ÷ Elapsed minutes
- Target gap = Target average speed − Average speed
Inputs explained
- Drawn Wire Length: Length counter total for the recorded observation window.
- Elapsed Observation Time: Elapsed minutes to two decimal places, including all recorded stops.
- Stopped Time: Logged stopped minutes to two decimal places inside the observation window.
- Target Average Draw Speed: Required length output per elapsed production minute.
How to use the result
- Best suited to Stop-Loss reviews, drawing shift output.
- Acceleration and individual capstan slip are not resolved.
Current U.S. benchmarks
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
- The U.S. has 5,397 electrical equipment and appliances establishments employing about 369,437 workers (Census County Business Patterns, 2023).
Common questions
- Why does running speed exceed the average? The same wire length is divided by fewer minutes after stops are removed.
- Should I subtract breaks before entering elapsed time? Keep breaks in elapsed time when their output loss belongs in the review, and include them once in stopped time.
- Can this set a capstan speed? No. Use the machine drive ratios, pass areas and supplier limits to establish individual capstan settings.
- What if the line never stopped? Enter zero stopped minutes. Running and average delivered speeds will then be equal.
Last reviewed 2026-10-13.