Attendance-Adjusted Capacity Calculator
Estimate good output after the stated attendance and availability losses. Use a staffed-hour production rate and scheduled line hours.
What this calculator does
- Use the output reduction to plan the window; isolate absence from other downtime before attributing the loss to attendance.
Formula used
- Nominal capacity = output per stated cycle × available cycles
- Expected good capacity = nominal capacity × uptime ÷ 100 × first-pass yield ÷ 100
- First-pass rejections = operating gross capacity − first-pass good capacity
Inputs explained
- Gross Output per Staffed Hour: Gross line output while the required crew is present.
- Scheduled Production Hours: Elapsed production hours planned for this same line.
- Attendance-Adjusted Availability: Combined available fraction after staffing absence and other included downtime.
- First-Pass Yield: Accepted first-pass share of the output produced.
How to use the result
- Best suited to checking shift capacity with reduced staff availability, comparing attendance assumptions before promising output.
- Average cycle output and availability do not represent station bottlenecks, precedence or changes in product mix.
Current U.S. benchmarks
- Average hourly earnings of production and nonsupervisory workers in U.S. manufacturing are $30.43 (BLS, Oct 2026), up 3.8% from a year earlier. Median machinist pay is $28.24/hr (OEWS 2025), with state medians on each state page. Manufacturers have 584k open positions nationally (BLS JOLTS).
Common questions
- Is this an absence percentage? No. The availability factor may include several losses; the model does not infer an absence rate.
- Why are the units hours? The existing input labels specify units per staffed hour and scheduled production hours.
- Are hours person-hours? They are elapsed line hours at the defined staffing level; do not multiply them by crew size here.
- Is yield applied twice? Use gross staffed-hour output before yield so the yield factor is applied only once.
Last reviewed 2026-10-13.