Market Data
Primary Nonferrous Metals: Reading the History Without Inferring a Copper or Aluminum Cycle
The archived range of BLS WPU1022 describes a broad price index. It does not independently identify demand, supply or the business cycle.
Correction (2026-11-17): This page previously described copper and brass mill shapes, and its address still does. The series it reports is BLS WPU1022, Primary Nonferrous Metals, covering the broad primary nonferrous metals commodity group. It is not a price for copper or brass mill shapes: it covers primary nonferrous metals, not mill products. The historical readings and page address are preserved.
Primary Nonferrous Metals stands at 589.63 index (1982=100) in the latest archived observation, Oct 2026, up about 42.7% from a year ago. These are index points with a 1982=100 base, not dollars per pound or per tonne.
Read the range as a price history
Across the 37-year archive, the archived low is 92.40 in Nov 1993 and the high is 591.42 in Sep 2026. The current reading is 100% of the distance from that low to that high. This is a position within a numeric range, not a statistical percentile or a probability of reversal.
Primary Nonferrous Metals, Oct 2026: 589.63. WPU1022; broad producer price index, 1982=100.
What would support a causal interpretation
A price change can reflect supply, demand, product composition and other conditions. A broad primary-metals or mill-shapes PPI cannot establish a copper-specific electrification squeeze, aluminum conversion pressure or an approaching industrial downturn. Investigate with matching product prices, quantities, inventories, capacity and order data. Keep any resulting causal explanation separate from the price observation itself.
Check the scope of any comparison
Use this series as broad producer-price context. It does not isolate aluminum, copper, brass, an alloy, a finished component or your supplier's invoice. A movement in the aggregate cannot identify which metal moved or separate raw-material, energy, labor and fabrication contributions. For a product-specific decision, obtain the corresponding product series and supplier pricing on the same units and dates.
Use your actual material price, quantity and an explicit change assumption to estimate cost sensitivity. Model a documented price scenario
Published 2026-07-13.