Market Data

Paper PPI: What Prices Can Tell You About Activity

Paper, up about 11.5% from a year ago. Paper is the source's product category. It is not a paperboard, corrugated container or finished packaging index. Earlier descriptions on these URLs overstated that scope.

Correction (2026-11-17): This page's address names paperboard and containers, but the series it reports is BLS WPU0913, Paper. It is not a price for paperboard or containers: it covers paper only. The address is kept so existing links still work.

The BLS Paper Producer Price Index (WPU0913) reads 285.77 index (1982=100) for Oct 2026, up about 11.5% from a year ago. The reference period identifies the observation; a later website refresh does not turn it into a daily price. This is a producer price index, not a delivered quote in dollars per unit.

Paper is the source's product category. It is not a paperboard, corrugated container or finished packaging index. Earlier descriptions on these URLs overstated that scope.

A price observation is not a quantity observation

Changes in paper producer prices do not establish a change in shipping volumes, factory orders or packaging demand. Those questions require quantity or activity observations over matching periods.

Prices can change because of supply, demand, product mix or contracting conditions. A positive price change does not by itself imply rising output, and a falling price does not establish weak orders. To investigate activity, compare a relevant quantity or production series over the same periods and state the limitations of the comparison.

Test a claimed lead before using it

A useful leading-indicator claim needs a defined target, a stated forecast horizon and testing on observations that were available at the time. A visual resemblance between revised historical charts is insufficient. Preserve those dates and evaluate results outside the period used to choose the rule.

For paper procurement, check grade, basis weight, finish, recycled content and contract terms. For boxes or cartons, obtain the appropriate paperboard or container benchmark and supplier specification. Converting, printing, adhesives and delivery require separate cost evidence.

Source and update notes

The source is BLS series WPU0913, also published by FRED at https://fred.stlouisfed.org/series/WPU0913. The linked data page provides the current observation and available history. A successful refresh changes readings only when the source returns changed data. Missing or failed observations must retain their original periods and be reported as unavailable or delayed.

Published 2026-07-13.