Abrasive Blasting, Shot Peening & Surface Prep calculator
Shot Peening Intensity Window and Saturation Check
Check a measured Almen intensity against both specification limits and the T-to-2T saturation criterion. Enter the intensities at T and 2T, both limits and the observed standard deviation.
What this calculator does
- Measured saturation intensity against both specification limits and the T-to-2T saturation criterion, with coverage kept separate.
Formula used
- T-to-2T increase = (intensity at 2T − intensity at T) ÷ intensity at T × 100
- Nearest margin = min(T intensity − minimum, maximum − T intensity)
- Estimated Cpk = nearest margin ÷ (3 × observed standard deviation)
- Both the saturation criterion and the intensity window must pass
Inputs explained
- Saturation Intensity: Almen arc height at the selected saturation time.
- Intensity at Double Time 2T: Almen arc height at twice the selected exposure time.
- Specified Minimum Intensity: Lower approved intensity limit for the strip designation.
- Specified Maximum Intensity: Upper approved intensity limit for the strip designation.
- Observed Intensity Standard Deviation: Within-condition standard deviation from repeat verification results.
How to use the result
- Best suited to setup verification, intensity-window review, repeatability improvement.
- Not a saturation-curve fitting or coverage determination engine. The governing drawing, process or customer specification controls acceptance.
Common questions
- Does this create a saturation curve? No. It checks the T and 2T values you supply. Curve construction and saturation-point selection must follow the applicable SAE procedure.
- Why check both intensity limits? A result can sit above the minimum and still exceed the approved maximum, or leave too little margin to the upper limit for stable production.
- Is a passing 10% result enough to release work? No. Strip procedure, full specification compliance, machine settings, media control, coverage and required records still apply to the release decision.
- Can different strip types be converted? Do not assume interchangeability. Use the strip designation and conversion rules authorized by the governing specification for the job.
Last reviewed 2026-10-01.