Material Substitution Review Gap Calculator

Track the remaining technical review for a proposed material substitution. Enter the required and completed evidence checks, expected review effort and available hours.

What this calculator does

  • Count unresolved material substitution evidence checks and estimate the labor needed to close them.

Formula used

  • Open checks = required evidence checks − completed evidence checks
  • Remaining review hours = open checks × minutes per open check ÷ 60
  • Review capacity headroom = available review hours − remaining review hours

Inputs explained

  • Required Technical Evidence Checks: Checks established from the approved specification and proposed substitution.
  • Completed Evidence Checks: Required checks completed with documented reviewer acceptance.
  • Review Time per Open Check: Estimated labor to close one remaining evidence check.
  • Available Review Hours: Labor hours assigned to the remaining technical review.

How to use the result

  • Best suited to alternate material review, engineering evidence planning.
  • Check counts do not measure failure probability, consequence severity or material equivalence. Closing every check does not authorize a substitution or replace required engineering approval.

Current U.S. benchmarks

  • Steel mill PPI stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. New factory orders are up 10.5% year over year (Census).
  • The U.S. has 11,691 transportation equipment establishments employing about 1,682,910 workers (Census County Business Patterns, 2023).

Common questions

  • Can this show that an alternate alloy is safe? No. Appropriate engineering analysis and evidence must establish suitability for the actual specification and service conditions.
  • Who defines the required evidence checks? The responsible engineering authority defines them from the approved specification, proposed change and its technical consequences.
  • Can I count a planned test as completed? No. Count it only after the required evidence is available and the reviewer accepts the check.
  • Why is the result blank with no required checks? An empty scope cannot establish review progress. Define the required technical evidence before estimating the remaining work.