EV & Battery Manufacturing calculator
Battery Pack Labor Cost Calculator
Find what pack assembly labor costs a program. You need the direct labor hours, the loaded labor rate, the share of hours charged to the program and the fixed labor support cost.
What this calculator does
- Pack assembly labor cost for a period from labor hours, the loaded rate, the program's share and fixed labor support cost.
Formula used
- Direct pack labor cost ($) = pack assembly labor hours × loaded labor rate × program labor share ÷ 100
- Total pack labor cost ($) = direct pack labor cost + fixed pack labor support cost
- Labor cost per labor hour = total pack labor cost ÷ pack assembly labor hours
Inputs explained
- Pack Assembly Labor Hours: Direct labor hours on pack assembly in the period.
- Loaded Labor Rate: Wage, benefits and payroll overhead per hour.
- Program Labor Share: Share of the labor hours charged to this program.
- Fixed Pack Labor Support Cost: Supervision, training and tooling support charged once.
How to use the result
- Best suited to quoting pack assembly labor, splitting labor between programs on one line.
- Does not model overtime premiums. Ignores indirect labor on material handling.
Current U.S. benchmarks
- As of Oct 2026, production and nonsupervisory workers in U.S. manufacturing earn $30.43 an hour on average (BLS), up 3.8% from a year earlier. That is pay before benefits and overhead, not a loaded rate, so enter your plant's own loaded rate here.
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
- U.S. light vehicles sell at a 15.5 million annual rate (BEA, Oct 2026), down 0.9% from a year earlier, the volume signal for automotive supply chains.
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
- The U.S. has 11,691 transportation equipment establishments employing about 1,682,910 workers (Census County Business Patterns, 2023).
Common questions
- What is the loaded labor rate? Wage plus benefits, payroll taxes and paid absence, per hour worked. Usually 1.3 to 1.6 times the base wage.
- What is the program labor share? The share of the line's labor hours charged to this program when the line builds several. One program alone carries 100%.
- What goes into labor support? Supervision, training, tooling maintenance and quality technicians serving the line, charged once for the period.
- Why labor cost per labor hour? It gives the fully supported hourly cost, the figure to compare with an automation cell's hourly cost.
Related guides
Last reviewed 2026-11-17.