EV & Battery Manufacturing calculator
Battery Traceability Coverage Calculator
Find how much of your battery output can be traced cell by cell. You need the units with complete genealogy, the units built and the coverage required.
What this calculator does
- Share of battery units with a complete build genealogy, compared with the coverage regulation or the customer requires.
Formula used
- Traceability coverage (%) = units with complete build genealogy ÷ battery units built × 100
- Gap to required coverage (points) = required traceability coverage − traceability coverage
- Units with gaps in genealogy = battery units built − units with complete build genealogy
Inputs explained
- Units With Complete Build Genealogy: Units whose cell, module and process records are complete.
- Battery Units Built: Units built in the period.
- Required Traceability Coverage: Coverage the regulation or customer requires.
How to use the result
- Best suited to pre-shipment traceability audit, preparing for a battery passport requirement.
- Does not weight gaps by what is missing. Ignores records that exist but are wrong.
Current U.S. benchmarks
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
- U.S. light vehicles sell at a 15.5 million annual rate (BEA, Oct 2026), down 0.9% from a year earlier, the volume signal for automotive supply chains.
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
- The U.S. has 11,691 transportation equipment establishments employing about 1,682,910 workers (Census County Business Patterns, 2023).
Common questions
- What is a complete build genealogy? Every cell serial linked to its module, every module to its pack, and every process record, from weld parameters to test results, linked to the serial.
- What coverage is required? What the regulation, the battery passport scheme or the customer contract states; 100% is common, with an agreed exception process. The 99.5% default is an example only.
- Why does the calculator stop when traced exceeds built? A unit has to exist before its genealogy can be complete, so traced units are bounded by units built. A higher figure points at a serial counted twice in the genealogy system.
- What do I do with units with gaps? Hold them, recover the records from station logs where possible and fix the scanner or interface that dropped them.
Last reviewed 2026-10-29.