Cathode Active Material & Precursor Manufacturing calculator

Lithium Excess Cost Calculator

Price the lithium you add above stoichiometry to make up for lithium lost in calcination. You need the stoichiometric lithium source mass, the excess you add, your target, the lithium price and the cathode made.

What this calculator does

  • Cost of lithium added above stoichiometry in a cathode blend, per batch and per kilogram of cathode, against your limit.

Formula used

  • Excess lithium source (kg) = stoichiometric lithium source × lithium excess added ÷ 100
  • Lithium excess cost ($) = excess lithium source × lithium source cost
  • Excess cost per kg cathode ($ / kg) = lithium excess cost ÷ cathode material from the blend
  • Excess above target (points) = lithium excess added − target lithium excess

Inputs explained

  • Stoichiometric Lithium Source: Lithium hydroxide or carbonate for a 1:1 lithium to metal ratio.
  • Lithium Excess Added: Extra lithium source above stoichiometry in the blend recipe.
  • Target Lithium Excess: Highest excess your process specification allows.
  • Lithium Source Cost: Delivered cost of the lithium source as purchased.
  • Cathode Material From the Blend: Calcined cathode material the blend produces.

How to use the result

  • Best suited to trimming excess lithium on a nickel-rich grade, costing a recipe change before a qualification run.
  • Does not model lithium lost to the kiln atmosphere or saggars, which sets how much excess you need. Ignores the cost of washing off residual lithium.

Common questions

  • How much excess lithium do cathode makers usually add? Commercial NMC typically carries less than 5% excess lithium. Your own excess comes from lithium loss in your kiln and atmosphere, so set it from residual lithium and capacity tests on your grade.
  • How do I convert a lithium to metal ratio into excess? Subtract 1 and multiply by 100. A ratio of 1.03 is a 3% excess. Enter that percentage, not the ratio.
  • Why does excess above target cost more than the lithium itself? Unreacted lithium stays on particle surfaces as hydroxide and carbonate. It can gel slurries and gas cells, so it must be washed off, adding a washing and drying step.
  • Does this include the stoichiometric lithium cost? No. It isolates the premium paid for lithium above stoichiometry. Multiply the stoichiometric mass by the price separately for the full lithium bill.

Last reviewed 2026-10-28.