Cathode Active Material & Precursor Manufacturing calculator
Energy Intensity Calculator
Track the electricity your cathode or precursor plant spends per kilogram of released material. You need average metered load, hours in the period, electricity price, accepted output and your energy target.
What this calculator does
- Electricity per kilogram of released cathode or precursor, its cost, and the gap to your energy target.
Formula used
- Process energy used (kWh) = average plant electrical load × hours in the period
- Energy intensity (kWh / kg) = process energy used ÷ accepted material output
- Total process energy cost ($) = energy used × electricity price; cost per kg = cost ÷ accepted output
- Intensity above target (kWh / kg) = energy intensity − target energy intensity
Inputs explained
- Average Plant Electrical Load: Average metered demand across reactors, kilns, dryers and utilities.
- Hours in the Period: Hours covered by the meter reading.
- Electricity Price: Blended price including demand charges.
- Accepted Material Output: Released cathode or precursor in the same period.
- Target Energy Intensity: Plant energy target from your budget or baseline.
How to use the result
- Best suited to daily energy review against plant baseline, reporting energy per kilogram to a customer.
- Excludes natural gas or oxygen if they are metered separately. A shared site meter mixes other products into the figure.
Current U.S. benchmarks
- As of Aug 2026, industrial electricity averages 9.64 cents per kWh across the U.S. (EIA), up 7.3% from a year earlier. State averages range widely, so plants should confirm against their own tariff.
Common questions
- Why divide by accepted output instead of everything produced? Energy spent on material that fails release still has to be paid for. Dividing by accepted output charges that waste to the product you can sell.
- How do I get average load from my meter? Divide the kWh registered over the period by the hours in it. Using that directly as energy used is fine too; enter the kWh as load with one hour.
- How does this differ from the calcination energy calculator? This covers the whole plant meter. The calcination calculator isolates one kiln firing and its saggar load, which helps when the kiln dominates your bill.
- Should demand charges be in the price? Yes, as a blended price: total electricity bill divided by kWh. Demand charges can be a large share of an industrial bill and belong in the cost per kilogram.
Last reviewed 2026-11-17.