Ceramic, Tile & Sanitaryware Manufacturing calculator
Packaging Breakage Reserve Calculator
Size the reserve for tile and sanitaryware that will break between the packing line and the customer, and check it against what you have booked. You need packed units, the breakage rate and the cost to replace one unit.
What this calculator does
- Expected cost of packed tile and sanitaryware broken in handling and transit, compared with the reserve you have booked.
Formula used
- Expected broken units = packed units at risk × expected packaging breakage rate ÷ 100
- Packaging breakage reserve = expected broken units × replacement cost per broken unit
- Reserve per packed unit = packaging breakage reserve ÷ packed units at risk
- Headroom = breakage reserve booked − packaging breakage reserve
- Breakage rate covered = breakage reserve booked ÷ (packed units at risk × replacement cost per broken unit) × 100
Inputs explained
- Packed Units at Risk: Tile boxes, crates or fixtures you will pack and ship this period.
- Replacement Cost per Broken Unit: Replacement ware, reship freight and claim handling for one broken unit.
- Expected Packaging Breakage Rate: Broken units ÷ units shipped, from your recent damage claims.
- Breakage Reserve Booked: Amount already accrued or budgeted for breakage this period.
How to use the result
- Best suited to setting a quarterly breakage accrual for tile shipments, pricing a per-box breakage allowance for distributors, checking a reserve after a packaging change.
- One blended rate hides lanes and products that break far more often; reserve those segments separately. Expected recoveries from carrier claims are not deducted from the reserve.
Current U.S. benchmarks
- Steel mill PPI stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. New factory orders are up 10.5% year over year (Census).
Common questions
- Should the replacement cost include reship freight? Yes, include every cost you carry when a unit arrives broken: replacement ware at cost, reship freight and the time spent on the claim. Leaving freight out understates the reserve by the full reship cost of every broken unit.
- How do I get an expected breakage rate? Divide the units reported broken by the units shipped over the same months, using claims from customers and carriers. Use several months on the same packaging, because one bad load can swing a short window.
- Where do corner guards, dividers and stretch wrap costs go? Outside this reserve, because you pay for protective packaging whether or not anything breaks. The reserve covers only the expected loss, so better packaging shows up here as a lower breakage rate.
- Can I net carrier claim recoveries against the reserve? Not in this calculation, which reserves the gross expected cost of breakage. Record a recovery separately once the carrier accepts the claim, so the reserve does not depend on a payment you may not receive.
Last reviewed 2026-10-28.