Ceramic, Tile & Sanitaryware Manufacturing calculator

Shrinkage Allowance Calculator

Size a plaster mold or press die so the piece fires to its drawing dimension and stays in tolerance. You need test bar drying and firing shrinkage, their scatter and the size tolerance.

What this calculator does

  • Mold or die size that fires to your drawing size, from measured drying and firing shrinkage, with a tolerance check on shrinkage scatter.

Formula used

  • Size after drying = target fired size ÷ (1 − firing shrinkage on dry length ÷ 100)
  • Mold or die size = size after drying ÷ (1 − drying shrinkage on wet length ÷ 100)
  • Total shrinkage on wet length = (mold size − fired size) ÷ mold size × 100; shrinkage allowance = mold size − fired size
  • Oversize on fired size = shrinkage allowance ÷ target fired size × 100
  • Fired size spread = mold size × shrinkage variation ÷ 100; tolerance margin = tolerance − spread

Inputs explained

  • Target Fired Size: Finished dimension along one axis, from the product drawing.
  • Drying Shrinkage: Measured on test bars of this body, from wet to dry.
  • Firing Shrinkage: Measured on the same test bars, from dry to fired.
  • Total Shrinkage Variation: Lot-to-lot scatter in total shrinkage, from your test bar log.
  • Fired Size Tolerance: Allowed deviation from the fired size on the product drawing.

How to use the result

  • Best suited to sizing a new plaster mold or press die, checking fired size after a body recipe change.
  • Warping and kiln temperature differences change local shrinkage; confirm on fired trial pieces before making production tools. Spread covers measured total shrinkage scatter only, not forming or measuring error. Drying shrinkage cannot be negative; size a die for a tile that dries larger than the die from fired trials.

Current U.S. benchmarks

  • Steel mill PPI stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. New factory orders are up 10.5% year over year (Census).

Common questions

  • Why not add drying and firing shrinkage together? Because they use different bases and compound. Drying shrinkage is a share of wet length and firing shrinkage a share of dry length, so 2% and 8% give 9.84% total shrinkage, not 10%.
  • How much do ceramic bodies shrink in firing? It depends on how vitreous the body is. Digitalfire lists whitewares at 7 to 8%, vitreous porcelains above 10%, stonewares about 5 to 6% and earthenwares 3 to 4% or less, dry to fired.
  • How does shrinkage scatter turn into fired size error? Each point of total shrinkage moves fired size by 1% of the mold size, because fired size equals mold size × (1 − total shrinkage). On a 665.5 mm mold, ±0.3 points moves fired size about ±2 mm.
  • Does a pressed tile die need a drying shrinkage allowance? Very little. Digitalfire notes dust pressing bodies can hold as little as 7% water and dry with almost zero shrinkage. Measure drying shrinkage from the die cavity to the dry tile, so any size change on ejection counts.

Last reviewed 2026-10-28.