Coffee, Tea, Roasting & Dry Goods Processing calculator
Green Bean Shrink Calculator
See how much weight a batch lost in roasting and how much of it was water. You need the green and roasted weights, a moisture reading on each and your target shrink.
What this calculator does
- Share of green coffee weight a batch loses in roasting, split into water driven off and roast loss, against your target shrink.
Formula used
- Green bean shrink = (green coffee charged − roasted coffee out) ÷ green coffee charged × 100
- Shrink above target = green bean shrink − target shrink; weight lost in roasting = green charged − roasted out
- Water driven off = green charged × green moisture ÷ 100 − roasted out × roasted moisture ÷ 100
- Roast loss beyond water = weight lost in roasting − water driven off
Inputs explained
- Green Coffee Charged: Green weight charged, from the batch scale.
- Roasted Coffee Out: Roasted weight after cooling, from the scale.
- Green Coffee Moisture: Moisture meter reading on the green coffee before roasting.
- Roasted Coffee Moisture: Moisture meter reading on the roasted coffee after cooling.
- Target Shrink: Shrink the roast profile allows for this coffee.
How to use the result
- Best suited to checking a profile after a roast degree change, comparing wet and dry green lots, setting a target shrink for a new coffee.
- Without a roasted moisture reading the split is unknown, though the shrink itself needs only the two weights.
Common questions
- What shrink is normal? Wikipedia puts roasting losses at 15 to 18% of the beans' mass, mainly water. Royal Coffee gives about 10% for very light roasts and up to 25% past second crack.
- Why split shrink into water and roast loss? Royal Coffee notes that moisture and roast degree together make roast loss. Water lost follows the green coffee's moisture; the rest is volatile compounds and matter driven off as the roast goes darker.
- Why do I need a roasted moisture reading? Roasted beans keep some water. Leaving it out overstates the water driven off and understates the roast loss.
- What do the defaults show? At these defaults, 1,000 lb of green at 11% moisture roasted to 835 lb at 2% is a 16.5% shrink. Of the 165 lb lost, 93.3 lb was water and 71.7 lb roast loss.
Last reviewed 2026-11-12.