Environmental Compliance, Waste & Water Management calculator
Waste Reduction ROI Calculator
Test whether a waste reduction project earns its investment. You need the investment, tons avoided a year, the cost each ton avoided saves, yearly support cost, the horizon and your discount rate.
What this calculator does
- Return on a waste reduction project over your horizon, from tons avoided and their cost, with the payback and net present value.
Formula used
- Net annual savings = waste avoided per year × cost avoided per ton − annual program support cost
- Waste reduction ROI = (net annual savings × evaluation horizon − project investment) ÷ project investment × 100
- Simple payback = project investment ÷ net annual savings, when savings are positive
- Net value over the horizon = net annual savings × evaluation horizon − project investment
- Net present value = net annual savings × (1 − 1 ÷ (1 + discount rate)^horizon) ÷ discount rate − investment; at a 0% rate, net value
Inputs explained
- Project Investment: Equipment, installation and startup cost of the project.
- Waste Avoided per Year: Tons a year the project keeps from being generated.
- Cost Avoided per Ton: Disposal, hauling and material cost each ton avoided saves.
- Annual Program Support Cost: Labor, maintenance and supplies the project needs each year.
- Evaluation Horizon: Years of savings you count, up to the equipment's life.
- Discount Rate: Your company's hurdle rate or cost of capital.
How to use the result
- Best suited to business case for a scrap regrind system, ranking waste reduction projects, checking a vendor's payback claim.
- Leaves out tax effects, salvage value and price escalation in disposal fees.
Current U.S. benchmarks
- As of Nov 9, 2026, the U.S. prime lending rate is 7.00% (Federal Reserve via FRED). Equipment loans and lines of credit typically price at prime plus a spread, so use your actual borrowing rate when you have it.
Common questions
- What is the difference between ROI and payback? ROI is the total return over the horizon as a share of the investment; payback is how many years savings take to repay it. A project can pay back fast and still have a small ROI.
- What should the cost avoided per ton include? Everything a ton of avoided waste no longer costs: the disposal fee, hauling, and the raw material that no longer becomes scrap.
- Why discount future savings? Because money later is worth less than money now; the discount rate is the return the money could earn elsewhere. Net present value applies it to each year's savings.
- What horizon should I use? The years you can count on the savings, no longer than the equipment's life. A shorter horizon is more conservative.
Last reviewed 2026-11-17.