Foundry & Forging calculator

Melt Chemistry Adjustment Calculator

Estimate the addition needed to raise one bath element using measured chemistry, additive assay and documented element recovery.

What this calculator does

  • Estimate the addition needed to raise one bath element using measured chemistry, additive assay and documented element recovery.

Formula used

  • p = additive assay ÷ 100; r = element recovery ÷ 100; t = target content ÷ 100
  • Retained addition fraction = 1 − p × (1 − r)
  • Required addition = bath weight × (target content − initial content) ÷ 100 ÷ (p × r − t × retained addition fraction)
  • Retained element = required addition × p × r; lost element = required addition × p × (1 − r)
  • Final bath = initial bath + addition − lost element; final content = (initial element + retained element) ÷ final bath × 100

Inputs explained

  • Initial Bath Weight: Measured liquid metal mass before the addition.
  • Initial Element Content: Current representative bath analysis for the target element.
  • Target Element Content: Approved target composition for this element.
  • Additive Element Assay: Target-element assay on the addition material certificate.
  • Expected Element Recovery: Documented recovery for the same addition and melting practice.

How to use the result

  • Best suited to lower element recovery requires more addition, higher element recovery requires less addition.
  • Only enrichment of one element is modeled; dilution, reactions and changes in other elements require a separate balance. Confirm the final chemistry with representative sampling before accepting the heat.

Current U.S. benchmarks

  • The producer price index for steel mill products stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The U.S. has 3,569 primary metal manufacturing establishments employing about 354,911 workers (Census County Business Patterns, 2023).

Common questions

  • Why is the addition larger than the element deficit? The additive contains carrier metal and may lose some target element. Its retained mass also increases the final bath mass.
  • Can I lower an element concentration here? No. This model only raises one element. Dilution or removal needs a different material balance.
  • What does recovery mean? It is the fraction of the target element in the addition that remains in the metal bath, based on matched operating records.
  • Is the calculated chemistry a release result? No. It is a mass-balance estimate. Verify mixing, furnace capacity, other elements and the final sampled chemistry.

Last reviewed 2026-10-13.