Furniture, Fixtures & Interior Products calculator
Wood Waste Cost Calculator
Price the board feet of wood waste a job generates, charge a share to that job, and add fixed handling. The page shows cost per board foot against your target.
What this calculator does
- Wood waste cost per board foot against a target, with the charged share and fixed handling split out.
Formula used
- Total wood waste cost = waste board feet × cost per board foot × share charged ÷ 100 + fixed handling cost
- Cost per board foot = total wood waste cost ÷ waste board feet
- Variable wood waste cost = waste board feet × cost per board foot × share charged ÷ 100
- Cost vs target per board foot = target cost per board foot − cost per board foot
Inputs explained
- Wood Waste Generated: Board feet of waste the job generates, from the waste log.
- Wood Cost per Board Foot: Landed wood cost per board foot for the material cut.
- Share Charged to This Job: Share of the waste cost charged to this job.
- Fixed Waste Handling Cost: Collection and disposal cost for this job, whatever the volume.
- Target Cost per Board Foot: Cost per board foot target from job costing.
How to use the result
- Best suited to charging a job for its waste, reviewing a month of shop waste, comparing waste across wood species.
- It prices waste that exists; prevention and reuse options sit outside it. Recovered offcuts or sold scrap reduce the real cost but are not modeled.
Current U.S. benchmarks
- The producer price index for lumber stands at 275.58 (BLS, Oct 2026), up 6.4% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 14,378 furniture and related products establishments employing about 355,594 workers (Census County Business Patterns, 2023).
Common questions
- What share of the waste should be charged to a job? The share from your job costing policy, often the portion of waste the job actually produced. The default 85 percent keeps a reserve for shared collection and disposal; enter 100 only when the whole pile belongs to this job.
- Why compare cost per board foot instead of the total? Per-foot cost is comparable across jobs and waste volumes, while the total tracks the pile. A large job can carry a big total and still sit under the target per foot.
- Does the share charged change the cost per board foot? Yes. The share scales the variable part, so a lower share lowers both the total and the per-foot cost. Fixed handling spreads over the same waste board feet, so it softens the change.
- How is wood waste measured? Count offcuts, trims and rejected parts, then convert their volume to board feet, where one board foot is 144 cubic inches. A waste log or scale ticket gives the ready figure.
Last reviewed 2026-10-01.