Grain Milling, Dry Bulk Food & Feed Handling calculator
Dust Collection Load Calculator
Check whether a dust collector's bags can take the airflow you send them. You need the airflow, bags installed and out of service, bag diameter and length, and the design air-to-cloth ratio.
What this calculator does
- Air-to-cloth ratio of a baghouse at your airflow and the bags in service, against its design ratio.
Formula used
- Cloth area per bag = π × bag diameter ÷ 12 × bag length
- Net cloth area = (bags installed − bag positions out of service) × cloth area per bag
- Net air-to-cloth ratio = airflow ÷ net cloth area; share of design = ratio ÷ design ratio × 100
- Airflow the bags in service can take = net cloth area × design ratio
- Bags needed = airflow ÷ (design ratio × cloth area per bag), rounded up
Inputs explained
- Airflow Through the Collector: Actual airflow at operating conditions, from a test or the fan curve.
- Bags Installed: Filter bags the collector holds, from its drawing.
- Bag Positions Plugged or Empty: Positions capped or missing a bag, from the maintenance log.
- Bag Diameter: From the bag supplier's specification.
- Bag Length: From the bag supplier's specification.
- Design Air-To-Cloth Ratio: The collector maker's maximum; EPA lists 14 for felt bags on grain.
How to use the result
- Best suited to adding a dust pickup to an existing collector, checking a collector with plugged bag positions, sizing replacement bags of a different length.
- For compartment baghouses cleaned offline, count the offline compartment's bags as out of service.
Current U.S. benchmarks
- The producer price index for steel mill products stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- Industrial natural gas averages $4.34 per Mcf (EIA, Aug 2026), down 2.9% from a year earlier, with industrial electricity at 9.64 cents per kWh. Process heating and refrigeration budgets track both.
- The U.S. has 17,154 machine shops establishments employing about 223,303 workers (Census County Business Patterns, 2023).
Common questions
- What design ratio should I use? The collector maker's figure. Without one, EPA's cost manual lists 3.5 ft/min for woven bags and 14 for felt bags on feed and grain dust as generally safe design values.
- Why count plugged bag positions? Capping a failed bag's position takes its cloth out of service, so the same airflow passes through less cloth and the ratio rises.
- Why size collectors to a design ratio? EPA's cost manual notes the gas-to-cloth ratio affects pressure drop and bag life, which is why a collector is sized to carry its airflow at a design ratio.
- What do the defaults show? At these defaults, 24,000 acfm through 112 bags, 6 inches by 10 feet, is 13.64 ft/min, 97.4% of a 14 ft/min design ratio.
Last reviewed 2026-11-12.