Grain Milling, Dry Bulk Food & Feed Handling calculator
Mill Throughput Calculator
Find the rate your mill really ran and whether next week's schedule makes the tons on order. You need tons milled, run hours, rated capacity, scheduled hours and tons on order.
What this calculator does
- Tons per hour your mill actually ran, against its rating and the run hours the week's orders need.
Formula used
- Mill throughput = tons milled ÷ mill run hours
- Share of rated capacity = mill throughput ÷ rated mill capacity × 100
- Tons the schedule makes = mill throughput × run hours scheduled
- Tons over or under the order = tons the schedule makes − tons on order
- Run hours needed for the order = tons on order ÷ mill throughput
Inputs explained
- Tons Milled: Finished tons from the scale or production log for the run.
- Mill Run Hours: Hours the mill ran, from its hour meter.
- Rated Mill Capacity: Design rate for this product and screen, from the nameplate or chart.
- Run Hours Scheduled: Mill run hours on next week's schedule.
- Tons on Order: Tons the week's orders need from the mill.
How to use the result
- Best suited to committing to the week's order book, checking a mill against its rating, planning overtime for a large order.
- A different product, screen or die changes the rate; measure each one separately.
Current U.S. benchmarks
- The producer price index for steel mill products stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- Industrial natural gas averages $4.34 per Mcf (EIA, Aug 2026), down 2.9% from a year earlier, with industrial electricity at 9.64 cents per kWh. Process heating and refrigeration budgets track both.
- The U.S. has 17,154 machine shops establishments employing about 223,303 workers (Census County Business Patterns, 2023).
Common questions
- Why not multiply the rate by an efficiency? Because tons milled over metered run hours already carry every slow stretch inside those hours. Multiplying by an efficiency again counts the same losses twice and understates what the mill makes.
- What rated capacity should I enter? The design rate for the product and screen or die you ran, from the nameplate or the maker's capacity chart. A rating for another product makes the share meaningless.
- What does the share of rated capacity measure? Speed: the rate the mill ran as a percentage of its rated rate, the performance part of overall equipment effectiveness. Downtime sits outside it because the hours are run hours.
- What do the defaults show? At these defaults, 120 tons in 8 run hours is 15 tons an hour, 93.8% of a 16-ton rating. Eighty scheduled hours make 1,200 tons against 1,100 on order.
Last reviewed 2026-11-12.