Industrial Filtration, Separation & Dust Collection calculator
Dust Collector CFM Calculator
Add the airflow requirements of simultaneous dust pickup points. Use qualified hood demands, the active hood count and any explicitly planned expansion reserve.
What this calculator does
- Add the airflow requirements of simultaneous dust pickup points.
Formula used
- Pickup airflow = Active identical hoods × CFM per hood + Other airflow
- Reserve airflow = Pickup airflow × Reserve % ÷ 100
- Design airflow = Pickup airflow + Reserve airflow
Inputs explained
- Simultaneous Identical Hoods: Hoods operating together with the same qualified airflow requirement.
- Specified Airflow per Hood: Machine supplier or ventilation design airflow for each hood.
- Other Simultaneous Airflow: Sum of separately specified unequal pickup requirements.
- Planned Airflow Reserve: Explicit expansion allowance from your design scope.
How to use the result
- Best suited to new pickup additions, collector airflow schedules.
- Hood capture velocities and duct pressure losses are not inferred.
Common questions
- How do I enter unequal hoods? Sum their individually specified demands into other simultaneous airflow.
- Can I use a diversity factor? Represent a justified operating combination with the active hood count. Do not reduce demands for equipment that can run together.
- Is the reserve a capture efficiency? No. It is added design airflow for an explicit allowance, not a prediction of contaminant capture.
- Can a fan rated at this CFM always deliver it? No. The fan must deliver the required flow at the system’s operating pressure loss.
Last reviewed 2026-10-13.