Industrial Filtration, Separation & Dust Collection calculator
Filter Area Sizing Calculator
Size installed filter area for your required airflow. Enter the qualified filtration velocity and the media fraction remaining online during cleaning.
What this calculator does
- Size installed filter area for your required airflow.
Formula used
- Online area = Airflow ÷ Qualified air-to-cloth ratio
- Installed area = Online area × 100 ÷ Available media %
- Offline allowance = Installed area − Online area
Inputs explained
- Design Collector Airflow: Combined airflow specified for simultaneously operating pickup points.
- Qualified Air-To-Cloth Ratio: Application ratio approved by your collector or media supplier.
- Media Available During Cleaning: Online share of total media from the compartment schedule.
How to use the result
- Best suited to baghouse compartment planning, media area comparisons.
- No generic filtration velocity or combustible-dust design limit is supplied.
Common questions
- Where does the qualified ratio come from? Use the collector supplier’s application selection for your dust and loading. A ratio borrowed from another process can undersize the filter.
- What does 100% available mean? All installed media remains available for filtration at the design condition.
- Why does less available media require more area? The same airflow must pass through less online media, so extra installed area preserves the selected filtration velocity.
- Does this choose a complete collector? No. Fan performance, hood capture, material compatibility and required protective equipment need separate selection.
Last reviewed 2026-10-13.