Machine Vision & Industrial Inspection AI calculator

Image Dataset Size Calculator

Plan a camera collection campaign before reserving production shifts. Enter planned parts before camera downtime, frames per part, measured uptime, usable image yield and your collection target.

What this calculator does

  • Estimate usable images collected per shift and shifts needed for your chosen collection volume.

Formula used

  • Planned images = images per part × planned parts per shift
  • Captured images = planned images × camera uptime ÷ 100
  • Usable images = captured images × usable yield ÷ 100
  • Downtime loss = planned − captured; quality loss = captured − usable
  • Whole shifts = ceiling(target usable images ÷ usable images per shift)

Inputs explained

  • Images per Part: Frames per part from the camera trigger recipe.
  • Planned Parts per Shift: Capture opportunities before camera downtime, from your production schedule.
  • Camera System Uptime: Camera available time divided by scheduled collection time.
  • Usable Image Yield: Usable captured images divided by all captured images.
  • Target Usable Images: Collection volume chosen for your labeling campaign.

How to use the result

  • Best suited to planning a labeling campaign, comparing camera availability improvements.
  • Image volume does not establish defect diversity, class balance or model accuracy. Shifts are an average planning estimate; rare defect collection may take longer.

Common questions

  • Should I enter actual inspected parts? No. Enter planned capture opportunities before camera downtime. Actual inspected throughput already includes availability losses.
  • Does the target guarantee enough training data? No. You choose the target; class coverage, image diversity and held-out validation determine whether the dataset supports your model.
  • Why is the image count fractional? It is an expected volume from measured percentages. Actual captured and accepted image counts are whole numbers.
  • What if usable collection is zero? The shift requirement is undefined. Restore capture availability or usable image yield before scheduling a completion date.

Last reviewed 2026-10-23.