Manufacturing Project Portfolio & Capex calculator
Project NPV Calculator
Estimate project value after annual discounting. Enter equal end-year cash flows, the upfront investment and any separate terminal cash amount.
What this calculator does
- Discount constant annual project cash flows and terminal value to the investment date.
Formula used
- Annual present value = sum of annual net cash / (1 + annual discount rate)^year
- Terminal present value = terminal net cash / (1 + annual discount rate)^horizon
- NPV = annual present value + terminal present value − upfront investment
- At zero discount, annual present value = annual net cash × horizon
- Undiscounted net cash = annual net cash × horizon + terminal cash − investment
Inputs explained
- Initial Project Investment: Use the positive cash amount paid at time zero.
- Annual Net Project Cash: Use consistent annual receipts less cash costs; losses are negative.
- Annual Cash Flow Periods: Use whole end-year payments within the supported project horizon.
- Annual Discount Rate: Use your documented project discount rate, consistently with cash estimates.
- Terminal Net Cash Value: Use final proceeds less removal cash, excluding the annual flow.
How to use the result
- Best suited to equipment discounted cash review, terminal removal cost sensitivity.
- Supports one to fifty whole years and nonnegative annual discount rates. Uneven cash flows, financing and separate tax schedules require a detailed model.
Current U.S. benchmarks
- As of Nov 9, 2026, the U.S. prime lending rate is 7.00% (Federal Reserve via FRED). Equipment loans and lines of credit typically price at prime plus a spread, so use your actual borrowing rate when you have it.
Common questions
- Is the discount input the old retained-value percentage? No. It is an annual discount rate. A higher rate reduces the present value of positive future receipts; the old aggregate adjustment is not converted automatically.
- Where should a final dismantling payment go? Enter it as negative terminal net cash, after offsetting any disposal proceeds. Do not also include it in the annual cash flow.
- What happens at a zero discount rate? Future dollars retain face value. Annual cash is multiplied by the whole horizon, terminal cash is added, and the initial investment is subtracted.
- Can annual cash flow be negative? Yes. A negative amount represents a recurring net cash cost. The calculator preserves its sign instead of treating it as a saving.