Office, School & Institutional Products calculator
Packaging Cube Calculator
Find how much cube an order takes once it is packed in master cartons, and how full each carton is. You need the case pack, outside carton dimensions and one retail unit's volume.
What this calculator does
- Shipping cube of an order packed in master cartons, with the carton count and how much of each carton is product.
Formula used
- Master cartons = ⌈units to pack ÷ units per master carton⌉
- Cube per carton = outside length × width × height ÷ 1,728 in³ per ft³
- Order packaging cube = master cartons × cube per carton
- Carton fill = units per carton × volume per retail unit ÷ (length × width × height) × 100
- Cube not holding product = order cube − units to pack × volume per retail unit ÷ 1,728; last carton = units − (cartons − 1) × units per carton
Inputs explained
- Units to Pack: Retail units on the order going into master cartons.
- Units per Master Carton: Case pack from the packing specification.
- Carton Outside Length: Measured outside the board, not the box maker's inside size.
- Carton Outside Width: Outside width of the sealed master carton.
- Carton Outside Height: Outside height of the sealed carton, flaps closed.
- Volume per Retail Unit: Length × width × height of one retail package.
How to use the result
- Best suited to booking freight for a back-to-school order, comparing a stock carton with a right-sized one.
- Counts carton cube only; pallets, pallet patterns and stacking gaps add cube this page does not model. Nesting products such as stacking chairs need the nested volume per unit, not each unit's own box.
Common questions
- Why use outside carton dimensions instead of the size on the box spec? Because the carton ships on its outside dimensions. Box makers usually specify boxes by inside dimensions for product fit, which understates the cube by the board thickness on every face.
- Why does an order that is not a case-pack multiple waste cube? The last carton ships full size with fewer units in it. At 500 units and 12 per carton, the 42nd carton holds 8 units, so product fills about 49% of its cube.
- How do I get the volume of one retail unit? Multiply the retail package's length, width and height in inches. For an unboxed item, use the smallest rectangular box that would hold it.
- How does a bigger carton change parcel shipping cost? It raises dimensional weight. Parcel carriers bill the greater of actual and dimensional weight, and dimensional weight is length × width × height divided by the carrier's factor.
Last reviewed 2026-10-28.