Packaging & Logistics calculator
Carton Cost per Unit Calculator
Allocate corrugated carton spend across the product units actually shipped. Include damaged cartons consumed during packing and any separate print setup.
What this calculator does
- Allocate corrugated carton spend across the product units actually shipped.
Formula used
- Carton lot cost = cartons consumed × carton price + print setup
- Carton cost per unit = carton lot cost ÷ shipped units
- Observed fill = shipped units ÷ consumed cartons
Inputs explained
- Cartons Consumed: Issued cartons less reusable cartons returned to stock.
- Landed Carton Price: Invoice cost including inbound freight per carton.
- Carton Print Setup Charge: One-time print or tooling charge for this lot.
- Units Shipped in Cartons: Accepted product units inside the completed cartons.
How to use the result
- Best suited to corrugated quote comparison, partial case cost review.
- Cushioning, labeling and packing labor are excluded.
Current U.S. benchmarks
- The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- On-highway diesel averages $5.94 per gallon this week (EIA), trending down over recent periods. Truck tonnage is down 1.6% year over year (ATA via BTS and FRED).
- The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
Common questions
- Is this a carton purchase price? No. The headline allocates all carton spending to shipped product units; the entered carton price remains a separate input.
- How are damaged empty cartons treated? Count them when they were consumed by the lot. Their cost is recovered across the good units shipped.
- What if the print setup serves several lots? Allocate the setup charge over the intended production volume before assigning this lot’s share.
- Why can units per carton be fractional? This is an observed average across consumed cartons, including partial and damaged cases, not an instruction to pack fractional units.
Last reviewed 2026-10-13.