Packaging & Logistics calculator
Packaging Cost per Unit Calculator
Find the packaging cost carried by each shippable unit. Use consumed materials, paid labor and accepted output from the same lot.
What this calculator does
- Find the packaging cost carried by each shippable unit.
Formula used
- Labor cost = paid packaging hours × loaded hourly rate
- Lot packaging cost = consumed materials + labor + separate setup
- Cost per accepted unit = lot cost ÷ accepted packaged units
Inputs explained
- Consumed Packaging Materials: Cost of cartons, film and cushioning actually consumed.
- Packaging Labor Hours: Paid packaging hours for this completed lot.
- Loaded Packaging Labor Rate: Wages, benefits and employer burden per paid hour.
- Lot Setup Cost: Packaging setup cost not already included above.
- Accepted Packaged Units: Completed units accepted for shipment.
How to use the result
- Best suited to packaging quote preparation, pack method cost comparison.
- Factory overhead and outbound freight are excluded.
Current U.S. benchmarks
- As of Oct 2026, production and nonsupervisory workers in U.S. manufacturing earn $30.43 an hour on average (BLS), up 3.8% from a year earlier. That is pay before benefits and overhead, not a loaded rate, so enter your plant's own loaded rate here.
- The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- On-highway diesel averages $5.70 per gallon this week (EIA), trending down over recent periods.
- The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
Common questions
- Do rejected packs increase unit cost? Yes. Materials and labor spent on rejects remain part of the lot cost while rejected units are excluded from shippable output.
- What belongs in setup cost? Include a separate tooling, artwork or setup charge. Exclude any labor already recorded in packaging hours.
- Can I enter purchased packaging inventory? Use material consumed by the lot, not the invoice for stock that remains unused.
- Is freight part of packaging cost? This model excludes outbound freight. Use the freight-per-unit calculator to add transportation on the same shipment basis.
Related guides
Last reviewed 2026-11-17.