Plant Utilities calculator
Boiler Firing Load Calculator
Determine boiler firing input from steam production and the actual enthalpy rise.
What this calculator does
- Determine boiler firing input from steam production and the actual enthalpy rise.
Formula used
- Steam heat = steam flow × (steam enthalpy − feedwater enthalpy) / 1000000
- Fuel input = steam heat / (efficiency / 100)
- Firing load = fuel input / rated fuel input × 100
Inputs explained
- Steam Production: Steam flowmeter reading for the selected operating point.
- Steam Enthalpy: Steam-table value at measured pressure and steam condition.
- Feedwater Enthalpy: Steam-table liquid enthalpy at boiler inlet conditions.
- Fuel-To-Steam Efficiency: Measured efficiency on the same heating-value basis as fuel.
- Rated Fuel Input: Boiler firing rating using the same fuel heating-value basis.
How to use the result
- Best suited to boiler firing load review, steam production sensitivity.
- Efficiency must include the relevant boiler losses for this operating point.
Current U.S. benchmarks
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
Common questions
- Can I use steam temperature alone? No. Obtain steam enthalpy from pressure and condition, including superheat or wetness where applicable.
- Why subtract feedwater enthalpy? The boiler adds only the energy between incoming feedwater and outgoing steam. Hotter feedwater reduces fuel needed for the same steam flow.
- Is this the burner efficiency? Use overall fuel-to-steam efficiency. Combustion efficiency alone can omit radiation, blowdown and other losses.
- What does a load above 100% mean? The entered steam requirement exceeds the fuel-input rating at the stated efficiency. It does not authorize operating above the equipment rating.
Last reviewed 2026-10-13.