Plant Utilities calculator
Cooling Tower Heat Rejection Calculator
Calculate water-side tower heat rejection and its approach to entering wet-bulb temperature.
What this calculator does
- Calculate water-side tower heat rejection and its approach to entering wet-bulb temperature.
Formula used
- Heat rejection = 500 × water GPM × (hot temperature − cold temperature)
- Approach = leaving water temperature − entering air wet-bulb
- Rating headroom = available rejection rating − measured rejection
Inputs explained
- Condenser-Water Flow: Measured tower-water flow at this operating point.
- Entering Hot Water: Tower inlet water temperature from the calibrated sensor.
- Leaving Cold Water: Tower outlet water temperature from the calibrated sensor.
- Entering Air Wet-Bulb: Local entering-air wet-bulb temperature measured during the same interval.
- Available Heat-Rejection Rating: Tower rating at the stated flow, range and approach.
How to use the result
- Best suited to cooling tower heat rejection review, Condenser-Water flow sensitivity.
- Evaporative water losses and tower performance curves are not solved.
Current U.S. benchmarks
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
Common questions
- Why is tower rejection higher than chiller cooling? A condenser also rejects compressor heat. Evaporator cooling duty alone understates the heat sent to the tower.
- Can leaving water be below wet-bulb? An ordinary evaporative tower cannot maintain that condition. Recheck sensor locations and the measured air condition.
- Does this calculate evaporation? No. It calculates sensible heat removed from the circulating water. Makeup, evaporation, drift and blowdown need a separate water balance.
- Is the 500 factor exact? No. It approximates water density and heat capacity. Use actual fluid properties where higher precision is required.
Last reviewed 2026-10-13.