Plant Utilities calculator

Cooling Load Variation Calculator

Quantify recorded cooling-load variation and compare the observed peak with available capacity.

What this calculator does

  • Quantify recorded cooling-load variation and compare the observed peak with available capacity.

Formula used

  • Load span = recorded maximum − recorded minimum
  • Peak-to-average ratio = maximum / time-weighted average
  • Peak headroom = available cooling capacity − recorded maximum

Inputs explained

  • Minimum Recorded Load: Lowest load from the defined trend-data interval.
  • Time-Weighted Average Load: Time-weighted average over the same complete recording period.
  • Maximum Recorded Load: Highest interval load in the same trend record.
  • Available Cooling Capacity: Available refrigeration capacity at the recorded operating conditions.

How to use the result

  • Best suited to cooling load variation review, maximum recorded load sensitivity.
  • Shorter unrecorded peaks and future process changes are not predicted.

Current U.S. benchmarks

  • Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.

Common questions

  • Does this calculate standard deviation? No. Three summary values cannot establish a distribution. Use interval data for standard deviation or percentile analysis.
  • Why require a time-weighted average? Unequal sampling intervals should contribute in proportion to their duration, otherwise average load can be biased.
  • Can the average lie outside the recorded extremes? No. That indicates mismatched periods, units or trend summaries and is rejected.
  • Does observed peak equal the design peak? No. The record may omit extreme weather, short transients or future process additions. Design duty needs a separate review.

Last reviewed 2026-10-13.