PLM, BOM & Digital Thread calculator

Part Revision Workload Calculator

Find how long a batch of part revisions will take to process through review and approval. You need the revision count, the processing rate, the allowance and the steward hours scheduled.

What this calculator does

  • Steward hours a batch of part revisions needs, with review and approval time, against the hours scheduled.

Formula used

  • Base revision hours = part revisions to process ÷ revisions processed per hour
  • Required revision hours = base revision hours × (1 + allowance ÷ 100)
  • Scheduled hours left = steward hours scheduled − required hours; load (%) = required ÷ scheduled × 100

Inputs explained

  • Part Revisions to Process: Revisions waiting to be processed this period.
  • Revisions Processed per Hour: Revisions one steward completes per hour, from the log.
  • Review, Routing and Approval Allowance: Extra time for review, routing and approvals.
  • Steward Hours Scheduled: Hours scheduled for revision processing.

How to use the result

  • Best suited to planning the week's revision processing, sizing stewards for a design refresh.
  • Does not model revisions rejected in review. Ignores the engineering work behind each revision.

Common questions

  • What counts as processing a revision? Checking the revised record, updating the BOM and drawing references, routing for approval and releasing. The engineering change itself is separate.
  • How do I set the rate? Divide revisions released by steward hours over a past period. The 4 per hour default is an example only.
  • What goes into the allowance? Review of the revised data, routing to approvers and the time approvals take to come back.
  • What if the required hours exceed the schedule? The calculator warns and shows the overrun. Group minor revisions, add a steward or defer non-urgent ones.

Last reviewed 2026-10-28.