PLM, BOM & Digital Thread calculator

Engineering Release Cycle Time Calculator

Find how long a queue of engineering release packages will take to check and release. You need the release count, the processing rate, the allowance and the checker hours scheduled.

What this calculator does

  • Checker hours a queue of engineering releases needs, with routing and delay time, against the hours scheduled.

Formula used

  • Base release hours = release packages to process ÷ releases processed per hour
  • Required release hours = base release hours × (1 + allowance ÷ 100)
  • Scheduled hours left = checker hours scheduled − required hours; load (%) = required ÷ scheduled × 100

Inputs explained

  • Release Packages to Process: Engineering releases waiting to be checked and released.
  • Releases Processed per Hour: Releases one checker completes per hour, from the log.
  • Setup, Handling and Delay Allowance: Extra time for setup, routing and waiting on approvers.
  • Checker Hours Scheduled: Hours scheduled for release processing.

How to use the result

  • Best suited to clearing a release backlog before a build, sizing checker hours for a launch.
  • Does not model releases rejected and resubmitted. Ignores priority ordering.

Common questions

  • What is a release package? The drawings, BOM and change paperwork released together for one part or assembly. Count packages, not individual documents.
  • How do I set the processing rate? Divide releases completed by checker hours over a past month. The 1.2 per hour default is an example only.
  • What goes into the allowance? Setting up the release, routing to approvers and waiting for their signatures.
  • What if the required hours exceed the schedule? The calculator warns and shows the overrun. Add a checker, release long-lead items first or move the build date.