PLM, BOM & Digital Thread calculator
Product Variant Cost Impact Calculator
Find what adding product variants costs in engineering, tooling and shared setup. You need the variants added, the cost per variant, the share reaching volume production and the shared setup cost.
What this calculator does
- Cost that added product variants impose from engineering and tooling, counting those reaching volume production, plus the shared setup.
Formula used
- Engineering and tooling on produced variants ($) = variant SKUs added × cost per variant × variants reaching volume production ÷ 100
- Total variant cost impact ($) = engineering and tooling on produced variants + shared digital thread setup
- Cost impact per variant added = total variant cost impact ÷ variant SKUs added
Inputs explained
- Variant SKUs Added: Product variants added to the catalog.
- Engineering and Tooling per Variant: Design, documentation and tooling cost of one variant.
- Variants Reaching Volume Production: Share of added variants that reach volume production.
- Shared Digital Thread Setup: Setup cost shared by all the variants.
How to use the result
- Best suited to deciding how many variants to launch, costing a configurable product family.
- Does not include the carrying cost of extra part numbers. Ignores lost volume on existing variants.
Common questions
- What counts as a variant? A sellable configuration with its own part number, BOM and documentation. Options resolved by a configurator rule without new parts do not count.
- What goes into engineering and tooling per variant? Design and drawing changes, documentation, test and any fixtures or tooling the variant needs.
- Why count only variants reaching volume? To cost the variants that will earn revenue. Variants dropped before volume are a development write-off tracked separately.
- Does the result include part carrying cost? No. The yearly cost of the extra part numbers is estimated in the duplicate part cost calculator.
Last reviewed 2026-10-28.