Reshoring & Tariff Strategy calculator

Reshoring Margin Impact Calculator

Find what reshoring does to margin. You need the selling price after reshoring, the reshored unit cost and the offshore unit cost the impact is measured against.

What this calculator does

  • Margin left after reshoring from the selling price and the reshored unit cost, as a share of the offshore cost basis it is measured against.

Formula used

  • Margin per reshored unit ($) = reshored selling price − reshored unit cost
  • Reshoring margin impact (%) = margin per unit ÷ offshore unit cost basis × 100
  • Reshored cost as share of offshore basis (%) = reshored unit cost ÷ offshore unit cost basis × 100

Inputs explained

  • Reshored Selling Price: Price per unit after reshoring.
  • Reshored Unit Cost: Domestic unit cost after reshoring.
  • Offshore Unit Cost Basis: Imported unit cost the impact is measured against.

How to use the result

  • Best suited to testing a reshoring case on margin, comparing reshoring with keeping the import.
  • Does not model volume changes after reshoring. Ignores price premiums for domestic origin.

Current U.S. benchmarks

  • USITC data put the full-year 2025 average effective tariff rate across 57 tracked families at 12.4% of covered customs value (calculated duties), up from 3.3% in 2024. This is a statistical aggregate, not verified cash paid or an entry-specific legal rate. Statutory and effective rates by family are at mfgcalcs.com/tariffs.
  • Sourcing currencies as of Nov 20, 2026 (Federal Reserve H.10): 6.6770 CNY and 19.0380 MXN per USD. Landed-cost comparisons move with these daily rates.
  • U.S. iron and steel import customs value ran $2.3B in Sep 2026 (Census International Trade). The U.S. ran a trade deficit of $0.7B in the category that month. This dollar total mixes price, quantity, product mix, origin, and timing; it does not measure physical import volume or prove a tariff or reshoring effect.

Common questions

  • What is the reshored unit cost? Material, domestic labor, overhead and freight to the customer per unit after the move, including the ramp's steady-state rate.
  • Why measure against the offshore basis? It puts the margin on the same scale as the import's, so the impact reads as a share of what the part used to cost.
  • What does a negative margin mean? The reshored cost exceeds the price. Automate, redesign for domestic manufacture or keep the import.
  • How does this relate to the payback? This checks margin per unit; the reshoring payback calculator checks whether the transition cost is recovered.

Last reviewed 2026-10-29.