Surgical Robotics Manufacturing calculator
Software Verification Load Calculator
Find what a software verification run costs in electricity and what that is per system verified. You need the rig's connected load, the runtime, your electricity rate and the systems verified.
What this calculator does
- Electricity used and its cost for a software verification run on the test rig, per hour and per system verified.
Formula used
- Energy used (kWh) = verification rig connected load × verification test runtime
- Energy cost of the run ($) = energy used × blended electricity rate
- Energy cost per system verified = energy cost of the run ÷ systems verified during the run
- Energy cost per hour = verification rig connected load × blended electricity rate
Inputs explained
- Verification Rig Connected Load: Power the rig, console and simulators draw while running.
- Verification Test Runtime: Hours the verification run lasts.
- Blended Electricity Rate: Your blended price per kilowatt-hour.
- Systems Verified During the Run: Systems whose software the run verifies.
How to use the result
- Best suited to costing an overnight regression suite, comparing rig configurations by energy.
- Does not include facility cooling. Ignores standby power between runs.
Current U.S. benchmarks
- As of Aug 2026, industrial electricity averages 9.64 cents per kWh across the U.S. (EIA), up 7.3% from a year earlier. State averages range widely, so plants should confirm against their own tariff.
- U.S. manufacturing runs at 76.1% of capacity with new factory orders at $677B per month (Federal Reserve and Census, Sep 2026).
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
- The U.S. has 8,825 medical equipment and supplies establishments employing about 308,388 workers (Census County Business Patterns, 2023).
Common questions
- What counts as connected load? The power the rig, console, patient simulator and instruments draw while the suite runs, measured at the panel.
- Why per system verified? A verification run usually covers several systems' software images. Dividing by systems gives a cost you can book against each one.
- Is this a significant cost? Rarely. A 12 kW rig for eight hours at 12 cents costs under $12. The figure matters for consolidating runs and choosing off-peak hours.
- Does the result include the test engineers' time? No. Labor is costed separately; this calculator covers electricity only.
Last reviewed 2026-11-17.