UAV & Drone Manufacturing calculator

Battery Pack Test Load Calculator

Find what cycling battery packs costs in energy. You need the rig's connected power draw, the runtime per session, the electricity rate and the packs cycled in the session.

What this calculator does

  • Energy a battery pack test rig uses in a session, its cost at the facility rate, and the energy cost of each pack cycled.

Formula used

  • Test rig energy per session (kWh) = test rig connected power draw × test rig runtime per session
  • Test rig energy cost per session ($) = energy per session × facility electricity rate
  • Energy cost per pack cycled = energy cost per session ÷ battery packs cycled; cost per hour = power draw × rate

Inputs explained

  • Test Rig Connected Power Draw: Power the battery test rig draws while running.
  • Test Rig Runtime per Session: Hours the rig runs in one test session.
  • Facility Electricity Rate: Blended price paid per kilowatt-hour.
  • Battery Packs Cycled per Session: Packs the rig cycles in one session.

How to use the result

  • Best suited to costing the pack test step, comparing resistive with regenerative test rigs.
  • Does not credit energy returned by regenerative rigs. Ignores facility cooling load.

Current U.S. benchmarks

  • As of Aug 2026, industrial electricity averages 9.64 cents per kWh across the U.S. (EIA), up 7.3% from a year earlier. State averages range widely, so plants should confirm against their own tariff.

Common questions

  • What is the connected power draw? The average kilowatts the rig draws while a session runs, from a sub-meter or a measured draw, not the breaker rating.
  • Why is the per-pack figure so small? A cycling rig draws modest power and tests many packs at once, so energy is a small part of pack test cost next to labor and rig time.
  • What did V1 label wrongly? V1 called the per-pack cost 'energy cost per kWh'. It is the session's energy cost divided by packs cycled, which V2 labels as such.
  • How do regenerative rigs change this? They return discharge energy to the facility, cutting the net draw. Enter the measured net draw to see the saving.

Last reviewed 2026-11-17.