UAV & Drone Manufacturing calculator
Test Range Run Time Calculator
Find whether a test campaign fits its range booking. You need the flights to complete, the flights per hour the range sustains, the weather and recharge allowance and the hours booked.
What this calculator does
- Range hours a flight test campaign needs from the flights, the throughput per hour and the weather, recharge and reset allowance, against the hours booked.
Formula used
- Base test range time (hr) = test flights to complete ÷ flight test throughput per hour
- Required test range time (hr) = base time × (1 + weather, recharge and reset allowance ÷ 100)
- Plan hours left = range hours booked − required hours; load (%) = required ÷ booked × 100
Inputs explained
- Test Flights to Complete: Flights the campaign must fly on the range.
- Flight Test Throughput per Hour: Flights the range completes per hour.
- Weather, Recharge and Reset Allowance: Extra time for weather holds, recharging and resets.
- Range Hours Booked: Hours the range is booked for the campaign.
How to use the result
- Best suited to booking a test range, explaining a campaign overrun.
- Does not model daylight limits. Ignores crew duty limits.
Current U.S. benchmarks
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
Common questions
- What is the flight test throughput? Flights completed per range hour including pre-flight, the sortie and the debrief, from past campaigns at this range.
- What goes into the allowance? Weather holds, battery recharge or swap between sorties and resetting instrumentation and the range, as a share of flying time.
- What if the load exceeds the hours booked? Book more hours, bring more charged batteries to cut recharge waits, or fly fewer configurations.
- How do I raise throughput? Spare battery sets, a second aircraft to alternate, and automated test cards that shorten pre-flight.
Last reviewed 2026-10-29.