UAV & Drone Manufacturing calculator
Drone Quote Margin Calculator
Find the gross margin on a drone quote and whether it meets your target. You need the quoted price, the fully loaded cost to deliver and the target gross margin.
What this calculator does
- Gross margin on a drone quote from the quoted price and the fully loaded cost, against your target, with the price that meets the target.
Formula used
- Gross margin on the quote ($) = quoted price to the customer − fully loaded cost to deliver
- Quote gross margin (%) = gross margin ÷ quoted price × 100
- Price that meets the target ($) = fully loaded cost ÷ (1 − target gross margin ÷ 100)
Inputs explained
- Quoted Price to the Customer: Price quoted for the aircraft or the order.
- Fully Loaded Cost to Deliver: Build, test, pack-out, warranty reserve and delivery cost.
- Target Gross Margin: Lowest gross margin your pricing policy accepts.
How to use the result
- Best suited to checking a quote before it goes out, reviewing margin by customer segment.
- Does not allocate overhead beyond the costs entered. Ignores payment terms and volume rebates.
Current U.S. benchmarks
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
Common questions
- Why measure margin on price? Gross margin is the share of each sales dollar left after cost. Markup on cost is a different, larger number for the same quote.
- What belongs in the fully loaded cost? Materials, assembly and test labor, calibration, flight test, pack-out, the field failure reserve, warranty handling and delivery.
- What does the price for target tell me? The lowest price that reaches your target margin on this cost. Quote at or above it, or take cost out.
- Why did V2 drop the price basis input? V1 divided the margin by a separate basis, which let the percentage drift from the price it should describe. Gross margin is on the quoted price.
Last reviewed 2026-10-29.