Cathode Active Material & Precursor Manufacturing calculator
Quality Sampling Load Calculator
Find the analyst hours release testing of precursor and cathode lots will take and whether the lab roster covers them. You need lots to release, samples per lot, analyst time per sample and hours available.
What this calculator does
- Analyst hours needed to release precursor and cathode lots, against the lab hours available.
Formula used
- Samples to test = lots to release × samples per lot
- Release testing workload (hr) = samples to test × analyst time per sample
- Lab load (%) = release testing workload ÷ analyst hours available × 100
- Spare analyst hours (hr) = analyst hours available − release testing workload
Inputs explained
- Lots to Release: Precursor and cathode lots needing release testing in the period.
- Samples per Lot: Samples your sampling plan draws from each lot.
- Analyst Time per Sample: Hands-on hours for the full test panel on one sample.
- Analyst Hours Available: Lab hours rostered for release testing in the period.
How to use the result
- Best suited to rostering the release lab for a production ramp, testing a reduced sampling plan.
- Ignores retests and out-of-specification investigations, which can add sharp peaks. Assumes one analyst skill pool can run every test.
Common questions
- What should analyst time per sample include? All hands-on time for the release panel: particle size, surface area, tap density, moisture, residual lithium and chemistry. Add sample preparation, data review and the certificate of analysis.
- Can I cut samples per lot to free lab time? Only if the sampling plan allows it. A lot is accepted or rejected from the defects found in its sample, so fewer samples change the protection your customer agreed to.
- How do retests affect the load? Add expected retests as extra samples per lot, from your out-of-specification rate. A lab near full load has no room to absorb a week of investigations.
- Why is instrument time left out? Autosamplers and overnight runs do not need an analyst. Count only the time a person spends, then check instrument capacity separately if it is the tighter limit.
Last reviewed 2026-10-28.