Coffee, Tea, Roasting & Dry Goods Processing calculator

Valve/Label Cost Calculator

Cost the valves and labels behind each good bag on a run. You need the good bags packed, the valves and labels issued, the price of each and your target cost per bag.

What this calculator does

  • Cost of degassing valves and labels per good coffee bag, counting setup waste and rejects, against your bill of materials.

Formula used

  • Valve and label cost = valves issued × price per valve + labels issued × price per label
  • Valve and label cost per bag = valve and label cost ÷ good bags packed
  • Valve waste = (valves issued − good bags) ÷ valves issued × 100; label waste is worked the same way from labels issued
  • Room under target = target cost per bag − valve and label cost per bag

Inputs explained

  • Good Bags Packed: Saleable bags from the line counter.
  • Valves Issued: Valves issued to the bagger for the run, from stores.
  • Labels Issued: Labels issued for the run, from stores.
  • Price per Valve: Degassing valve price from the invoice.
  • Price per Label: Label price from the invoice.
  • Target Cost per Bag: Valve and label cost per bag in the bill of materials.

How to use the result

  • Best suited to costing a run's packaging components, checking label waste after a stock change, setting the bill of materials cost.
  • Bag film, closures and freight sit outside it; add them for the full packaging cost.

Common questions

  • Why does every bag need a valve? Rovema calls gas flushing and a one-way degassing valve necessary for freshness: the valve lets the gases the coffee releases escape the bag during storage.
  • Why divide by good bags only? Rejected bags used valves and labels too, but nobody buys them. Spreading the cost over good bags shows what each saleable bag really carries.
  • Where does the waste come from? Setup and splices at the bagger, misapplied valves or labels, and bags the checkweigher or seal check rejects.
  • What do the defaults show? At these defaults, 9,900 valves and 10,050 labels cost $1,066.05 over 9,600 good bags: $0.111 a bag, under a $0.12 target.

Last reviewed 2026-11-12.