Coffee, Tea, Roasting & Dry Goods Processing calculator
Bag Fill Giveaway Calculator
Find giveaway from a packing run's own weights, with or without a checkweigher. You need the roasted pounds into packing, bags packed, label weight, coffee recovered, roasted coffee cost and your target.
What this calculator does
- Coffee a packing run gives away above label weight, from the roasted pounds in and the bags out, against your giveaway target.
Formula used
- Label weight packed = bags packed × label net weight ÷ 16
- Bag fill giveaway = roasted coffee into packing − coffee recovered or scrapped − label weight packed
- Average overfill per bag = giveaway × 16 ÷ bags packed; giveaway share = giveaway ÷ label weight packed × 100
- Cost of the giveaway = giveaway × roasted coffee cost; bags given away = giveaway ÷ (label net weight ÷ 16)
- Saving at the target = (giveaway − target giveaway × label weight packed ÷ 100) × roasted coffee cost, or 0
Inputs explained
- Roasted Coffee Into Packing: Roasted pounds sent to the bagger, from the bin scale.
- Bags Packed: Good bags from the line counter.
- Label Net Weight: Net weight declared on the bag label.
- Coffee Recovered or Scrapped: Coffee from rejected bags and sweepings, from the scrap log.
- Roasted Coffee Cost: Cost per roasted pound, from the cost sheet.
- Target Giveaway: Giveaway your QA plan allows, as a share of label weight.
How to use the result
- Best suited to costing giveaway on a shift report, checking a filler without a checkweigher, setting a giveaway target.
- Unrecorded spills count as giveaway; log sweepings and recovered coffee to keep it honest.
Common questions
- What does NIST Handbook 133 require? That the average net quantity of the packages in a lot at least equal the label. A package short by more than its Maximum Allowable Variation is an unreasonable error.
- Why work giveaway from pounds in and bags out? It needs only the bin scale, the line counter and the scrap log, so it works on a filler with no checkweigher. It also catches coffee lost anywhere between bin and bag.
- Why count bags of coffee given away? It turns the pounds into bags you could have sold: the giveaway divided by the label weight of one bag.
- What do the defaults show? At these defaults, 7,420 lb in, 70 lb recovered and 9,600 bags of 12 oz leave 150 lb given away. That is 0.25 oz a bag, 2.08% of label weight and 200 bags.
Last reviewed 2026-11-12.