pH Adjustment Chemical Cost Calculator

Price your pH adjustment reagent and see how much more you feed than the wastewater needs. You need the reagent used, gallons neutralized, the titration demand, the price and the fees.

What this calculator does

  • Cost of acid or caustic for pH adjustment, compared with what a bench titration says the wastewater needs, with the cost of any excess.

Formula used

  • Reagent cost = acid or caustic used × reagent price per gallon; total = reagent cost + tank, delivery and testing fees
  • Cost per thousand gallons neutralized = total ÷ wastewater neutralized
  • Reagent the titration calls for = wastewater neutralized × titration demand
  • Reagent above the titration demand = the larger of 0 and reagent used − reagent the titration calls for; its cost = excess × price
  • Dose utilization = reagent the titration calls for ÷ acid or caustic used × 100

Inputs explained

  • Acid or Caustic Used: Reagent drawn in the period, from tank levels or delivery records.
  • Wastewater Neutralized: Thousand gallons through the pH system, from the flow totalizer.
  • Titration Demand: Reagent per thousand gallons to reach target pH, from a bench titration.
  • Reagent Price per Gallon: Delivered price per gallon of acid or caustic.
  • Tank, Delivery and Testing Fees: Tank rental, delivery and lab testing charges for the period.

How to use the result

  • Best suited to checking a pH control system's reagent use, budgeting acid or caustic for the year, comparing reagents of different strength.
  • A titration done on one day's wastewater can miss changes in load; retitrate when processes change.

Common questions

  • How do I find the titration demand? Take a representative sample, add the reagent you feed in measured steps until it reaches your target pH, and scale the volume used to a thousand gallons. Repeat with several samples.
  • Why would a system use more reagent than the titration? Anything that feeds past the endpoint the titration found, such as overshooting the target pH, adds reagent the wastewater did not need. The excess row shows what that costs.
  • What if the system uses less than the titration? Dose utilization goes over 100%. Either the wastewater was milder than the sample, or the effluent may not reach its pH limits, so check the effluent records.
  • Can I compare acid and caustic costs here? Yes, run each with its own titration demand and price per gallon. The cost per thousand gallons row puts them on the same basis.

Last reviewed 2026-11-12.