Wastewater Treatment Chemical Cost Calculator
Price a coagulant or other treatment chemical from the dose you run. You need the thousand gallons treated, the dose, the jar-test optimum, the product strength, its price and the fees.
What this calculator does
- Cost of a wastewater treatment chemical from flow, dose and product strength, with what dosing above the jar-test optimum adds.
Formula used
- Product used = wastewater treated ÷ 1,000 × 8.34 × dose applied ÷ (product strength ÷ 100)
- Chemical cost = product used × delivered price per pound; total = chemical cost + feed system, lab and delivery fees
- Cost per thousand gallons treated = total ÷ wastewater treated; dose utilization = jar-test optimum ÷ dose applied × 100
- Product above the jar-test optimum = wastewater treated ÷ 1,000 × 8.34 × (dose applied − optimum, not below 0) ÷ (product strength ÷ 100)
- Cost of dosing above the optimum = product above the optimum × delivered price per pound
Inputs explained
- Wastewater Treated: Thousand gallons through the system, from the flow totalizer.
- Dose Applied: Active chemical dose from the feed rate and flow, in mg/L.
- Jar-Test Optimum Dose: Lowest dose that met the treatment target in your last jar test.
- Product Strength: Active content of the delivered product, from its SDS or certificate.
- Delivered Price per Pound of Product: Price per pound of product as delivered, from the invoice.
- Feed System, Lab and Delivery Fees: Feed pump upkeep, lab testing and delivery charges for the period.
How to use the result
- Best suited to checking a coagulant feed rate, budgeting treatment chemicals for the year, comparing products of different strength.
- A jar test reflects the water tested; recheck it when flow, pH or the pollutant load changes.
Common questions
- How do I find the optimum dose? Run a jar test: dose equal samples of your wastewater at different levels, mix, flocculate and settle them, and take the dose with the lowest turbidity. Repeat it when the wastewater changes.
- Why divide by product strength? Because a 40% product carries 0.4 lb of active chemical per pound delivered, so meeting an active dose takes 2.5 times as much product by weight.
- What does dose utilization tell me? It is the jar-test optimum as a share of the dose applied. At 82%, nearly a fifth of the product does no work beyond what the jar test needed.
- Is a dose below the optimum a saving? Only if the effluent still meets its limits. Below the jar-test optimum, check turbidity or the pollutant you treat before keeping the lower feed rate.
Last reviewed 2026-11-12.