MES, MOM & Shop-Floor Data Systems calculator

MES License Cost per Line Calculator

Price full and basic MES license tiers without treating basic lines as free.

What this calculator does

  • Price full and basic MES license tiers without treating basic lines as free.

Formula used

  • Tier subscriptions = lines × (full-tier price × full-tier share + basic-tier price × remaining share)
  • Annual license cost = tier subscriptions + annual platform fee
  • Cost per line = annual license cost / positive licensed lines

Inputs explained

  • Licensed Production Lines: Use the total lines included in the annual license quote.
  • Annual Full-Tier Price: Use the quoted annual price for a full-tier line.
  • Full-Tier Line Share: Use the expected share assigned to the full license tier.
  • Annual Platform Fee: Use the separately quoted fixed annual platform fee.
  • Annual Basic-Tier Price: Use the quoted annual price for the remaining basic-tier lines.

How to use the result

  • Best suited to MES license cost per line review, lower and higher Full-Tier line share.
  • Percentage allocation is a planning mix; reconcile whole billed tier counts with the final quote.

Common questions

  • Are lines outside the full tier free? No. They receive the separately entered basic-tier annual price.
  • Can percentage allocation produce a fractional line? Yes, as a planning equivalent; reconcile whole billed tier counts with the final contract.
  • Does changing the tier mix change the platform fee? No. The fixed annual platform amount remains unchanged in this model.
  • What if no production lines are licensed? The platform charge remains visible; cost per licensed line is unavailable.

Last reviewed 2026-10-13.