Plant Utilities calculator
Plant Air Demand Growth Calculator
Project coincident compressed-air demand from added production lines and documented retired loads.
What this calculator does
- Project coincident compressed-air demand from added production lines and documented retired loads.
Formula used
- Future demand = current demand + concurrent new lines × demand per line − retired demand
- Supply headroom = available delivery − future demand
Inputs explained
- Current Coincident Air Demand: Measured current peak on the declared standard-air reference basis.
- Added Demand per Line: Concurrent air demand per proposed production line.
- New Concurrent Lines: Whole new lines expected to demand air simultaneously.
- Demand Retired: Existing coincident demand permanently removed by the project.
- Available Compressor Delivery: Available delivery at required pressure on the identical standard basis.
How to use the result
- Best suited to plant air demand growth review, new concurrent lines sensitivity.
- Distribution pressure drop, receiver response and control limits require separate review.
Current U.S. benchmarks
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
Common questions
- Does every new line run simultaneously? Enter the number expected to demand air together. Use operating evidence rather than adding a generic diversity factor.
- Where does leakage belong? Include existing leakage in current demand and expected new leakage in the documented added-line demand. Avoid an unexplained efficiency multiplier.
- Can retired demand exceed current demand? No. A retired load must be part of the current measured demand within this boundary.
- Does positive headroom prove pressure will hold? No. Piping, treatment equipment, receiver storage and compressor controls can limit delivered pressure during transients.
Last reviewed 2026-10-13.