Finishing calculator

Paint Mix Ratio Calculator

Turn the can's mix ratio into pour quantities. Enter the four components' parts by volume; the page returns ounces per gallon of total mix.

What this calculator does

  • Mix ratio components converted to fluid ounces per gallon of total mix, scaled to any pot.

Formula used

  • Total ratio parts = paint + catalyst + reducer + additive
  • Component per gallon of mix = 128 fl oz × component parts ÷ total ratio parts
  • For any pot: multiply each figure by the pot's gallons of total mix

Inputs explained

  • Paint Component: Base coating's share of the ratio by volume.
  • Catalyst Component: Hardener or activator share by volume, per the TDS.
  • Reducer Component: Thinner or reducer share by volume, within the TDS range.
  • Additive Component: Accelerator, flex or flattening agent parts; zero if unused.

How to use the result

  • Best suited to converting a can ratio into pour quantities, posting bench cards in ounces per gallon, checking pours before mixing an expensive system.
  • Weight-basis ratios need density conversions this page does not carry. The page sizes the pour; it does not check pot life. Metered plural-component equipment does not use batch pours.

Current U.S. benchmarks

  • Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
  • The producer price index for industrial chemicals stands at 345.03 (BLS, Oct 2026), up 17.1% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The U.S. has 14,543 chemical manufacturing establishments employing about 911,245 workers (Census County Business Patterns, 2023).

Common questions

  • How do I mix paint at a 4:1:1 ratio? Four volumes of paint, one of catalyst, one of reducer, six parts total. Per gallon of mix that is 128 × 4/6 = 85.33 ounces of paint and 21.33 each of catalyst and reducer. Double for a two-gallon pot.
  • Is the basis per gallon of paint or mix? Per gallon of total mix, as every row states. A card computed per gallon of paint would pour 32 ounces of catalyst against 128 of paint, a batch half again larger than the pot expects.
  • What happens if the catalyst ratio is off? Both directions fail, invisibly at first. Under-catalyzed film stays soft and loses chemical resistance; over-catalyzed film embrittles and pot life collapses. Measure the catalyst pour, never estimate it.
  • Can I change the ratio to fix viscosity? No. Viscosity lives in the reducer and only within the TDS reduction range; the paint-to-catalyst ratio is chemistry, not preference. If in-range reduction cannot reach spray viscosity, temperature or a different reducer grade is the answer.

Last reviewed 2026-10-01.