Product Compliance, Labeling & Certification calculator
CE Documentation Effort Calculator
Find the engineering hours a CE technical file will take, including standards research and sign-off. You need the section count, the drafting rate, the allowance and the hours scheduled.
What this calculator does
- Engineering hours a CE technical file needs, with standards research and sign-off time, against the hours scheduled.
Formula used
- Base documentation hours = technical file sections to prepare ÷ sections drafted and reviewed per hour
- Required documentation hours = base documentation hours × (1 + allowance ÷ 100)
- Scheduled hours left = engineering hours scheduled − required hours; load (%) = required ÷ scheduled × 100
Inputs explained
- Technical File Sections to Prepare: Sections of the technical file still to draft.
- Sections Drafted and Reviewed per Hour: Sections completed per hour, from past files.
- Standards Research, Revision and Sign-Off Allowance: Extra time to research standards, revise and sign off.
- Engineering Hours Scheduled: Hours scheduled for the technical file.
How to use the result
- Best suited to planning a first technical file, updating a file after a design change.
- Does not model notified body review. Ignores translation of user information.
Current U.S. benchmarks
- The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 22,301 printing and related support establishments employing about 386,248 workers (Census County Business Patterns, 2023).
Common questions
- What is a technical file? The set of documents showing how the product meets the applicable EU legislation: design, risk assessment, test reports and user information.
- How do I set the rate? Divide sections completed by engineering hours on a past file for a similar product. The 0.5 per hour default is an example only.
- What goes into the allowance? Finding the right harmonized standards, revising sections after review and the sign-off cycle.
- What if the required hours exceed the schedule? The calculator warns and shows the overrun. Reuse sections from a similar file, add an engineer or move the declaration date.
Last reviewed 2026-10-28.