Semiconductor Advanced Packaging & Test calculator
Flip Chip Yield Calculator
Turn a flip chip yield into the solder joint defect rate behind it. You need good units, units assembled, solder bumps per die and your target yield.
What this calculator does
- Flip chip yield from good and assembled units, the joint defect rate it implies across the bumps, and the joint rate the target needs.
Formula used
- Flip chip yield = good flip chip units ÷ units assembled × 100; gap to target = target − yield
- Defects per unit implied = −ln(flip chip yield ÷ 100), from the Poisson yield e^(−λ)
- Joint defects per million implied = defects per unit ÷ solder bumps per die × 1,000,000
- Joint defects per million for the target = −ln(target ÷ 100) ÷ solder bumps per die × 1,000,000
- Units lost = flip chip units assembled − good flip chip units
Inputs explained
- Good Flip Chip Units: Units passing interconnect test after reflow and underfill.
- Flip Chip Units Assembled: Units through flip chip attach in the same lot or period.
- Solder Bumps per Die: Bumps on each die, from the bump map.
- Target Flip Chip Yield: The flip chip yield your process plan commits to.
How to use the result
- Best suited to setting bump defect targets for new dies, comparing dies with different bump counts, tracking flip chip yield per lot.
- Clustered defects break the Poisson assumption; when failures bunch on some units the implied joint rate reads high.
Current U.S. benchmarks
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
- The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 11,261 computer and electronic products establishments employing about 815,443 workers (Census County Business Patterns, 2023).
Common questions
- Why convert yield into defects per million joints? Because it puts dies with different bump counts on one scale. A 1,200-bump die at 97.6% yield and a 300-bump die at 99.4% run at about the same joint defect rate.
- What is the Poisson yield model? It treats defects as falling at random, so yield is the chance of zero defects: e^(−λ), with λ the defects per unit. The same form gives die yield as e^(−A × D) from area A and defect density D.
- When does the model mislead? When defects cluster, for example on one strip or one edge of a substrate. Poisson assumes defects spread evenly, so check where failures sit before trusting the rate.
- What joint defect rate do I need? The target row gives it: for 98% yield on 1,200 bumps, about 16.8 defects per million joints.
Last reviewed 2026-11-12.